
Verified 3V0-32.21 dumps Q&As - 100% Pass from Prep4sureGuide
Pass 3V0-32.21 Exam in First Attempt Guaranteed 2022 Dumps!
VMware 3V0-32.21 Exam Syllabus Topics:
| Topic | Details |
|---|---|
| Topic 1 |
|
| Topic 2 |
|
| Topic 3 |
|
| Topic 4 |
|
| Topic 5 |
|
| Topic 6 |
|
NEW QUESTION 35
An organization wants to provide automated self-service IaaS catalog to all departments within the organization. The key stakeholders have asked for the platform to be resilient to component failures and each department consume the same on-premises infrastructure but can only see and manage machines which belong to their department.
Choose one design decision that will meet the business requirements.
- A. Deploy single node deployment and use projects to separate the departments.
- B. Deploy multi-node deployment and use tenants to separate the departments.
- C. Deploy single node deployment and use tenants to separate the departments.
- D. Deploy multi-node deployment and use projects to separate the departments.
Answer: B
NEW QUESTION 36
An architect is designing a greenfield VMware vRealize Cloud Management solution. During the requirements gathering workshop with the customer, the future Service Owner made the following comment:
The Maximum Tolerable Downtime (MTD) for the Cloud Management solution is 1 hour.
When creating the design documentation, which design quality should be used to classify the requirements?
- A. Manageability
- B. Availability
- C. Performance
- D. Recoverability
Answer: D
NEW QUESTION 37
An architect is completing the physical design for a vRealize Operation (vROps) solution for a customer. The customer has only provided the following information for their existing environment:
500 Virtual Machines
2 VMware vCenter Servers
10 VMware vSphere Horsts
20 Datastores
Live data should be stored within the vROps solution for 6 months
The RTO for all existing management components is 4 hours
The RTO for all existing management components is 1 hour
Which two assumptions could the architect make when sizing the vROps cluster? (Choose two.)
- A. The minimum data retention within vRealize Operations Cluster will be 12 months.
- B. The RTO of the vROps solution will be 4 hours.
- C. The vROps cluster will be configured as High Availability.
- D. The resource profile of a virtual machine will be, on average, 1 vCPU and 2 GB RAM.
- E. The RPO of the vROps solution will be 1 hour.
Answer: B,C
NEW QUESTION 38
An architect is responsible for designing a new Operations Management solution for a customer. The customer has provided the following information about their existing VMware Software Defined Data Center (SDDC) environment:
The customer uses a SaaS-Based Service Desk solution.
The existing environment is located across two geographical regions.
In each region, the customer already has deployed a vSphere-based virtual environment that spans two well connected physical locations.
The customer has recently upgraded all of their licenses to VMware vCloud Suite Advanced subscription.
The customer has already successfully deployed and configured a vRealize Operations 8 solution in each region.
The customer would like to ensure that:
All vSphere log events must be captured, stored locally and forwarded to a third-party log management solution to ensure regulatory compliance.
Specific vSphere log event's can be captured within a region, monitored and then trigger alerts direct to the Service Desk which can then be assigned to regional support teams.
Operations monitoring for all of the VMware SDDC solution can be consolidated into a single user interface.
Which three recommendations should the architect make to meet the requirements? (Choose three.)
- A. Deploy vRealize Operations Cloud and vRealize Log Insight 8.x integration.
- B. Configure vRealize Operations 8.x and vRealize Log Insight Cloud integration.
- C. Deploy vRealize Operations Cloud and configure Federated Analytics.
- D. Deploy vRealize Log Insight Cloud and configure the vSphere integration.
- E. Configure vRealize Operations 8.x and vRealize Log Insight 8.x integration.
- F. Deploy vRealize Log Insight 8.x and configure the vSphere integration.
Answer: B,D,F
NEW QUESTION 39
Which design decision should an architect make to support continuous availability in vRealize Operations?
- A. Each Fault Domain should contain only remote collector nodes.
- B. Each Fault Domain should consist of primary, witness and remote collector nodes.
- C. The vROps cluster should be separated into two Fault Domains.
- D. The vROps cluster should be separated into three Fault Domains.
Answer: C
NEW QUESTION 40
An architect is tasked with the following:
Build a private cloud solution for an organization using VMware vRealize Automation.
This private cloud needs to manage two different datacenters separated geographically.
The private cloud solution needs to be highly available.
Which of the following approaches can the architect take to achieve this?
Note: VMware Identity Manager has been renamed as VMware Workspace ONE Access.
- A. Deploy a 3-node Workspace ONE Access cluster in a single-site design architecture in one of the datacenters.
- B. Deploy a Workspace ONE Access cluster in a multi-site design architecture with 3-nodes spanning both the datacenters.
- C. Deploy a Workspace ONE Access cluster in a multi-site design architecture with 3-nodes in each of the datacenters.
- D. Deploy a single-node Workspace ONE Access instance in a single-site design architecture in one of the datacenters.
Answer: C
NEW QUESTION 41
A company is planning to deploy a new cloud management solution that will allow business users to deploy servers via a self-service portal. After the initial discovery workshop with the new service owner, the architect has gained the following key information about the project:
In an effort to increase user experience, the IT Manager has requested that all deployments do not rely on manual approvals.
The current IT team is made up of five engineers but only one engineer has any experience writing scripts or automating server deployments.
The current version of the CMDB solution has no API available to create or destroy configuration items (CI) and there is no budget for upgrades.
Currently all CMDB activities are completed manually via service request with an SLA of 4 hours.
The customer has one data center with a requirement of protection against data center failure.
The expected availability SLA (measured monthly) will be 99.5%.
The deployment of a server is expected to take no longer than 2 hours.
Given the information provided, which two risks should the architect document within the design? (Choose two.)
- A. There is insufficient resources available to complete the project.
- B. Allowing self-service deployments of servers by business users.
- C. The lack of REST-API for IP address management solution.
- D. The customer only has a single data center location.
- E. The end to end server deployment cannot be achieved in the time window.
Answer: C,E
NEW QUESTION 42
What two statements are true about vRealize Operations Manager high availability (HA)? (Choose two.)
- A. Upon failure of the primary node, failover to the replica is automatic.
- B. To enable HA, you must deploy at least 3 data nodes, plus the primary node.
- C. If the primary node fails, the replica node can take over all functions of the primary node.
- D. Data collection must be restarted from the administrative interface when the primary node fails.
- E. With HA, data stored in the primary node is partially backed up on the replica node.
Answer: A,D
NEW QUESTION 43
An architect is designing the deployment of vRealize Log Insight (vRLI) in their data center. The customer has the following requirements:
vRLI cluster responds to multiple Virtual IP Addresses (VIPs)
Each event message received from a VIP is associated with a tag
Which two design decisions would the architect make to achieve the requirements? (Choose two.)
- A. Configure a list of dynamic tags (key=value) for an integrated load balancer VIP, so that each event message received from a VIP is annotated with a tag.
- B. Each node should have at least one network interface on the same subnet as that of a VIP.
- C. Configure a CSV file to use with VIP tags.
- D. Configure a list of static tags (key=value) for an integrated load balancer VIP, so that each event message received from a VIP is annotated with a tag.
- E. Each node should have at least one network interface on a different subnet as that of a VIP.
Answer: B,D
NEW QUESTION 44
An architect is responsible for creating the design for vRealize Operations. The following requirements, constraints, and recommendations were gathered:
Enable Continuous Availability
Monitor two physical locations
The sizing guide recommends deploying 5 analytics nodes
What are two design considerations for the analytics node deployment? (Choose two.)
- A. Two fault domains need to be created
- B. Anti-affinity rules will need to be created
- C. High Availability will need to be enabled
- D. A sixth analytics node is needed
- E. Extra Large Nodes must be used
Answer: A,E
NEW QUESTION 45
An architect is designing a greenfield Cloud Management solution. During the requirements gathering workshop with the customer, the following information was captured:
The log monitoring solution must be capable of collecting a minimum of 10,000 evets per second.
The automation solution must be capable of deploying at least 20 concurrent workloads.
When creating the design documentation, which design quality should be used to classify the requirements?
- A. Manageability
- B. Availability
- C. Performance
- D. Recoverability
Answer: C
NEW QUESTION 46
A customer wants to implement vRealize Suite Lifecycle Manager (vRSLCM) as a part of a new SDDC deployment.
The customer has two physical data centers and number of branch offices.
The customer has recently purchased Hyper-converged Infrastructure (HCI) hardware that has to be implemented and configured.
The customer has a target availability Service Level Agreement (SLA) of 99.99%, measured quarterly, for the management components.
Which recommendation should the architect make to achieve the requirements?
- A. Deploy a vRSLCM appliance on a vSAN stretched cluster
- B. Deploy a vRSLCM appliance on a vSAN cluster
- C. Deploy a 3-node vRSLCM cluster on a vSAN stretched cluster
- D. Deploy a vRSLCM appliance in one DC and replicate it to the second DC
Answer: B
NEW QUESTION 47
An architect has been engaged to update an operations management solution design to include VMware vRealize Suite Lifecycle Manager (vRSLCM) so that the support team can reduce the complexity of environment and content management activities. The customer has provided the following information with regards to the existing environment:
There are four environments for business applications:
Development
Staging
Production
DR
The solution consists of two well-connected data centers (with low latency, high bandwidth links).
All Production workloads and management tooling are deployed to Data Center 1 (DC1).
All Staging, Development and DR workloads run in Data Center 2 (DC2).
Each physical data center has one vCenter Server and a sufficient number of hosts for workload and management.
There are two separate VMware vRealize Operations (vROps) clusters, one in each data center location.
Currently all content is developed in the DC2 vROps cluster before being manually imported into the DC1 vROps cluster.
Which two design decisions should the architect include in the solution? (Choose two.)
- A. A single vRSLCM appliance will be deployed into each physical datacenter.
- B. A single vRSLCM appliance will be deployed into DC1.
- C. An environment will be created within vRSLCM across both physical data centers to logically group management components.
- D. An environment will be created within vRSLCM for each physical environment to logically separate management components.
- E. An environment will be created within vRSLCM for each physical data center to logically separate management components.
Answer: A,C
NEW QUESTION 48
A customer will use their vRealize Automation solution to provision and manage both production and development workloads.
During workshops, the customer has communicated the following information about the environment:
The production and development workloads are deployed to separate vCenter Servers.
Three different user groups have been identified for access to the solution: Application Developers, Application Owners, and Infrastructure Operators The customer has communicated the following requirements:
Only Application Owners and Infrastructure Operators may be permitted to deploy production workloads.
A limit should be applied to the number of development workloads concurrently deployed by each user type.
Application Owners must not be able to view or modify another user's deployment(s).
In addition to the creation of separate Production and Development Cloud Zones, which three design decisions meet the requirements? (Choose three.)
- A. Define a priority of 0 for the production Cloud Zone in the project used by Application Developers.
- B. Add the Application Owners and Infrastructure Operators groups to the production project.
- C. Define an instance limit for projects using the development Cloud Zone.
- D. Define a Cloud Assembly project for production and another for development.
- E. The deployment sharing option should be turned off for the Application Owners project.
- F. Define a Cloud Assembly project for each user group.
Answer: A,C,F
NEW QUESTION 49
An organization that extensively uses vRealize Orchestrator workflows for vRealize Automation integrations has the following challenges:
Each VM provisioning request executes 50 workflows for integration with various third-party tools.
Many developers from different teams, unaware of each other's work, create and maintain the workflows.
Whenever vRealize Automation VM deployments fail, a lot of time and resources are spent debugging failures.
Which cloud management product will help speed up the organization's troubleshooting effects?
- A. vRealize Suite Lifecycle Manager
- B. vRealize Network Insight
- C. vRealize Operations Manager
- D. vRealize Log Insight
Answer: D
NEW QUESTION 50
A customer wants to deploy Workspace ONE Access for vRealize Suite users.
The customer wants to achieve the following requirements:
Availability SLA 95% uptime per month, calculated Monday-Friday, 24 hours per day.
The deployment footprint must be minimal.
Which design decision should the architect choose?
- A. Deploy a Workspace ONE Access cluster and protect it with vSphere HA.
- B. Deploy a Workspace ONE Access node and protect it with Fault Tolerance.
- C. Deploy a Workspace ONE Access cluster and protect it with Fault Tolerance.
- D. Deploy a Workspace ONE Access node and protect it with vSphere HA.
Answer: C
NEW QUESTION 51
Which two statements are correct for VMware Cloud Services cloud proxy? (Choose two.)
- A. An OVA deployment to an ESXi server is supported.
- B. It requires a load balancer.
- C. It helps connect to public cloud entities.
- D. It connects cloud services to on-premises networks.
- E. An OVA must be deployed on a vCenter Server.
Answer: D,E
NEW QUESTION 52
Consider the following requirements to be used in determining a vRealize Operations licensing model:
Authentication provided by Single Sign On
Performance monitoring and analytics for 12 Hosts and 1 vCenter
vSphere security and compliance monitoring for PCI and HIPAA
Guided remediation for discovered issues
Customizable dashboards, reports and views
Using the requirements, what is the minimum license that can be used for this deployment of vRealize Operations?
- A. Advanced
- B. Enterprise
- C. vRealize Cloud Universal Enterprise
- D. Standard
Answer: A
NEW QUESTION 53
A customer wants to design and deploy Workspace ONE Access to provide multi-tenancy for vRA 8.x deployment.
Which two designs decisions would achieve the customer's requirement? (Choose two.) Note: SAN stands for Subject Alternative Name.
- A. Configure SSL bridging on the load balancer for Workspace ONE Access.
- B. Configure a certificate with a single SAN entry for Workspace ONE Access.
- C. Configure SSL termination on the load balancer for Workspace ONE Access.
- D. Configure a certificate with multiple SAN entries for Workspace ONE Access.
- E. Configure SSL passthrough on the load balancer for Workspace ONE Access.
Answer: B,C
NEW QUESTION 54
......
3V0-32.21 Dumps Full Questions - Exam Study Guide: https://www.prep4sureguide.com/3V0-32.21-prep4sure-exam-guide.html