NEW QUESTION 44
When do you use variant bills of materials (BOMB)?

  • A. When multiple material also have the same BOM
  • B. When multiplematerial is have similar BOMB
  • C. When a material has a configurable BOM
  • D. When a material has multiple BOMB

Answer: A

 

NEW QUESTION 45
What are the consequences when you assign a planned order to a production line manually, using the planning table in repetitive manufacturing?

  • A. The planned order is converted to a production order.
  • B. The planned order generates capacity requirements.
  • C. The planned order's component availability is checked
  • D. The planned order's components are copied from the picking list.

Answer: B

 

NEW QUESTION 46
You are working with planning strategy 40 (Planning-with-final assembly). When does consumption of planned independent requirements take place?

  • A. When the MRP results are saved
  • B. When you create a sales order
  • C. When you create a planned order
  • D. When you deliver a sales order

Answer: B

 

NEW QUESTION 47
Your quality department detects a deviation in a raw material batch. Unfortunately, this batch has already been used in production. How can you identify all affected finished goods stocks?

  • A. Use batch determination.
  • B. Use the material where-used report.
  • C. Use the material staging report.
  • D. Use the batch information cockpit.

Answer: D

 

NEW QUESTION 48
Which of the following elements does MRP take into account during net requirement calculation? Note: There are 2 correct answers tothis question.

  • A. Lot size
  • B. Purchase orders
  • C. Maximum stock level
  • D. Safety stock

Answer: A,D

 

NEW QUESTION 49
If the stock level drops below the reorder stock in reorder point planning, what is the system logic to trigger procurement?

  • A. Fill up based on the lot size procedure
  • B. Fill up to the safety stock level
  • C. Fill up to the reorder stock level
  • D. Fill up to the maximum stock level

Answer: A

 

NEW QUESTION 50
Duringproduction order creation, several valid production versions are found. How does the system choose the product conversion?

  • A. Alphanumeric or quota arrangement
  • B. Lot size or material cost
  • C. Planned order or materialnumber
  • D. Validity period or sales order

Answer: A

 

NEW QUESTION 51
Your project uses process orders for the production of liquid chemicals. What can you define to ensure that the production flow happens only in physically connected tanks?

  • A. Work center hierarchy
  • B. Operation network
  • C. Resource network
  • D. Setup matrix

Answer: A

 

NEW QUESTION 52
Which materials have a negative quantity in a bill of materials or in a recipe? Note: There are 3 correct answers to this question.

  • A. Continuous flow materials
  • B. Co-products
  • C. Waste products
  • D. By-products
  • E. Bulk materials

Answer: B,C,D

 

NEW QUESTION 53
You use planning strategy Finite Scheduling - with Reverse and want to allow scheduling in the past. How can you achieve this?

  • A. Specify a positive planning horizon in the strategy profile.
  • B. Specify a negative planning horizon in the strategy profile.
  • C. Specify a negative offset time in the strategy profile.
  • D. Specify a positive offset time in the strategy profile.

Answer: C

 

NEW QUESTION 54
What data can you maintain in the sub items of a bill of material (BOM)? Note: There are 2 correct answers to this question.

  • A. Quantity
  • B. Installation point
  • C. Item type
  • D. Scrap percentage

Answer: A,B

 

NEW QUESTION 55
When can the material availability check occur automatically in a production order? Note: There are 2 correct answers to this question.

  • A. At order release
  • B. At order confirmation
  • C. At order creation
  • D. At order settlement

Answer: A,C

 

NEW QUESTION 56
If you use floats to limit dispatching in capacity planning, what type of time element can be reduced by strategy settings while dispatching?

  • A. Minimum wait time
  • B. Production time
  • C. Goods receipt processing time
  • D. Queue time

Answer: D

 

NEW QUESTION 57
What does forecasting in the demand planning cycle include? Note: There are 3 correct answers to this question.

  • A. Past procurement quantities
  • B. Past quotation quantities
  • C. One-off events
  • D. Past sales order quantities
  • E. Market intelligence

Answer: C,D,E

 

NEW QUESTION 58
A material has been set up as a phantomassembly by entering the special procurement key in the material master. How can you switch off the phantom assembly in a specific bill of material(BOM)?

  • A. Change the phantom item indicator for the phantom assembly in the BOM.
  • B. Change the special procurement key of the phantom assembly in the BOM.
  • C. Change the item category of the phantom assembly in the BOM.
  • D. Change the explosion type of the phantom assembly in the BOM.

Answer: D

 

NEW QUESTION 59
You want to triggering-houseproduction of a semi-finished mater al before a sales order for the corresponding finished good is received. Which planning strategy supports the consumption of planned independent requirements for the semi-finished material?

  • A. Planning without final assembly (50)
  • B. Planning at assembly level (70)
  • C. Make-to-order production (20)
  • D. Planning with final assembly (40)

Answer: A

 

NEW QUESTION 60
You want to set up a make-to-order planning scenario for a finished material. Some components from the bill of materials (BOM) should be procured per sales order, other components should be procured for various requirements. Fore casting is NOT possible. Which settings do you make to achieve this?

  • A. Planning strategy 20 (Make-to-Order) and the corresponding Mixed MRP indicator
  • B. Planning strategy 50 (Planning without final assembly) and the corresponding individual Collective Indicator.
  • C. Planning strategy 20 (Make-to-Order) and the corresponding individual Collective indicator
  • D. Planning strategy 50 (Planning without final assembly) and the corresponding Mixed MRP indicator

Answer: B

 

NEW QUESTION 61
How can you set up the supply source for the SAP Kanban process? Note: There are 3correct answers to this question.

  • A. Using quotations for internal and external procurement
  • B. Using purchase orders for external procurement
  • C. Using run schedule quantities for in-house production
  • D. Using stock transfer reservations for stock transfer
  • E. Using purchasing costs for automated source prioritization

Answer: B,C,D

 

NEW QUESTION 62
When working with both cross-plant and plant-specific material statuses in the mater al master, which status has the highest priority?

  • A. The plant-specific status
  • B. The least restrictive status
  • C. The cross-plant status
  • D. The most restrictive status

Answer: D

 

NEW QUESTION 63
Which master data object governs the relationship between supply source and demand source in the Kanban process?

  • A. Control cycle
  • B. Production supply area
  • C. Rate routing
  • D. Replenishment strategy

Answer: A

 

NEW QUESTION 64
In your plant, MRP is activated. Which options do you have to exclude a material from the MRP run?Note:
There are 2 correct answers to this question.

  • A. Use a specific material group
  • B. Use a specific MRP type.
  • C. Use a specific material status.
  • D. Use a specific MRP controller.

Answer: B,D

 

NEW QUESTION 65
......