NEW QUESTION 45
You want to prevent delivery creation when a required field is left empty during sales order entry. How can you achieve this?
- A. Assign an incompleteness procedure to the respective delivery item categories.
- B. Select the Warning indicator for the field in the incompleteness procedure.
- C. Set the dialog message for incompletion for the sales document type.
- D. Assign an applicable status group to the field that should be checked for completeness.
Answer: C
NEW QUESTION 46
When creating a returns delivery, the business wants the goods to be placed into quality inspection instead of returns stock. Which field would have to be changed to achieve this?
- A. Requirements type
- B. Movement type
- C. Item type
- D. MRP type
Answer: B
NEW QUESTION 47
You purchase materials from a third party supplier for sale and delivery to your customers. You want to ensure that creation of a sales order automatically results in the creation of a purchasing document.How can you do this? Note: There are 2 correct answers to this question.
- A. Use a schedule line category in which a purchasing document type is specified.
- B. Use an item category in which the Item Relevant for Delivery field is set.
- C. Use a sales document type in which the Reference Mandatory field is activated.
- D. Use an item category in which the Schedule Lines Allowed field is activated.
Answer: A,C
NEW QUESTION 48
Which standard calculation rules are available when setting up a free goods master record? Note: There are 2 correct answers to this question.
- A. Inclusive quantities
- B. Pro rata
- C. Unit reference to units
- D. Maximize quantities
Answer: B,C
NEW QUESTION 49
In the event of a material shortage, your customer wants you to ship as much material as possible on the requested date, while still requiring eventual delivery of the full ordered quantity. What do you set to achieve this requirement?
- A. The Only Complete Delivery Allowed indicator
- B. The Unlimited Tolerance indicator
- C. The Partial Delivery Allowed indicator
- D. The Complete Delivery indicator in the sales order header
Answer: C
NEW QUESTION 50
Which steps must be completed to use a specific SAP Fiori tile format for a KPI evaluation? Note: There are 3 correct answers to this question.
- A. Create the exception report in the back-end system.
- B. Assign the tile to an evaluation.
- C. Choose an appropriate tile format and create the tile.
- D. Assign the tile to the KPI.
- E. Assign the tile to a catalog and a tile group.
Answer: B,D,E
NEW QUESTION 51
What are some of the characteristics of SAP Best Practices for SAP S/4HANA? Note: There are 3 correct answers to this question.
- A. Best Practices consist of solution packages, scope items and building blocks.
- B. Scope items must be included in the project scope.
- C. Test scripts are available in scope items.
- D. Scope items represent predefined business process functionality delivered out of the box.
- E. Each building block is unique to a scope item.
Answer: A,D,E
NEW QUESTION 52
The business wants to use the requested delivery date as the pricing date in sales orders. Where do you maintain this?
- A. In the pricing procedure
- B. In the sales document type
- C. In the customer master sales and distribution view
- D. In the schedule line category
Answer: B
NEW QUESTION 53
What can you do in the SAP Fiori app Sales Order Fulfillment Issues? Note: There are 2 correct answers to this question.
- A. Monitor sales orders in critical stages.
- B. Create a new sales order.
- C. Check and edit the payment terms on header and/or item level.
- D. Use natural language processing to update sales orders.
Answer: A,C
NEW QUESTION 54
Which of the following are examples of outbound processes in SAP Extended Warehouse Management?
Note: There are 2 correct answers to this question.
- A. Load management
- B. Internal routing
- C. Picking optimization
- D. Scrapping
Answer: A,D
NEW QUESTION 55
Where can you set a condition exclusion indicator? Note: There are 2 correct answers to this question.
- A. In the pricing procedure
- B. In the condition record
- C. In the access sequence
- D. In the condition type
Answer: B,D
NEW QUESTION 56
What characterizes the Intelligent Enterprise? Note: There are 2 correct answers to this question.
- A. The enterprise system enables users to work with live data and embedded analytics.
- B. Users execute multiple reports to understand performance against their KPIs.
- C. The transactional and analytical components of the enterprise system have been separated.
- D. Embedded real-time monitoring delivers full visibility of all core sales processes.
Answer: A,D
NEW QUESTION 57
How does the process flow of SAP Smart Business for sales order fulfillment help you? Note: There are 2 correct answers to this question.
- A. It provides access to actions to solve process problems.
- B. It enables the assignment of release orders to be reversed.
- C. It provides access to make corrections in master data.
- D. It highlights issues using status colors.
Answer: A,C
NEW QUESTION 58
Which tools are available within SAP S/4HANA to support operational reporting? Note: There are 2 correct answers to this question.
- A. SAP Analytics Cloud
- B. SAP Lumira Designer
- C. Query Browser
- D. SAP Smart Business cockpit
Answer: A,B
NEW QUESTION 59
Which of the following functions are controlled by the delivery item category? Note: There are 3 correct answers to this question.
- A. Check minimum quantity
- B. Returns
- C. Availability check
- D. Item relevant for delivery
- E. Automatic batch determination
Answer: C,E
NEW QUESTION 60
You are creating output using the Business Rule Framework plus (BRFplus) approach. How does the system process a BRFplus decision table to retrieve the required result?
- A. Every row is processed in sequence. In each row, every condition column cell is processed from left to right.
- B. Every row is processed in sequence. In each row, every result column cell is processed from left to right.
- C. Every row is processed in sequence. In each row, every condition column cell is processed from right to left.
- D. Every condition column is processed in sequence. In each condition column, every row is processed from top to bottom.
Answer: A
NEW QUESTION 61
......