
SAP C-TS422-2504 Dumps Updated Dec 20, 2025 WIith 82 Questions
View All C-TS422-2504 Actual Free Exam Questions Dec 20, 2025 Updated
NEW QUESTION # 48
When can you maintain the batch characteristic values in SAP S/4HANA?
Note: There are 2 correct answers to this question.
- A. When you record inspection results
- B. When you execute batch determination
- C. When you release the batch
- D. When you post the goods receipt
Answer: A,D
NEW QUESTION # 49
Which of the following questions do you have to answer before you start creating a bill of material (BOM)? Note: There are 2 correct answers to this question.
- A. In which storage location is the BOM required?
- B. When does the BOM need to become effective?
- C. Which base unit of measure must the BOM have?
- D. For which plant can the BOM be defined?
Answer: B,D
NEW QUESTION # 50
Which time elements does MRP consider in backward scheduling to determine the basic dates for components from dependent requirements? Note: There are 2 correct answers to this question.
- A. In-house production time
- B. Operation duration
- C. Planned delivery time
- D. Total replenishment lead time
Answer: A,C
NEW QUESTION # 51
Which chart types does the tabular planning table for capacity planning provide in SAP S/4HANA Cloud Private Edition?
Note: There are 2 correct answers to this question.
- A. Order (pool) chart
- B. Capacity requirements chart
- C. Work center capacities chart
- D. Order (dispatched) chart
Answer: B,C
NEW QUESTION # 52
How can you limit the validity of a bill of material (BOM)?
Note: There are 2 correct answers to this question.
- A. By material status
- B. By material type
- C. By change number
- D. By plant
Answer: B,D
NEW QUESTION # 53
What options are available inside a document?
Note: There are 2 correct answers to this question.
- A. Storage locations
- B. Versioning
- C. Plant links
- D. Object links
Answer: B,D
NEW QUESTION # 54
For a production version to be valid and consistent, what requirements must be fulfilled? Note: There are 3 correct answers to this question.
- A. The deletion flag must NOT be set for the bill of material (BOM) or the routing.
- B. The assigned routing and bill of material (BOM) must be valid in the entire validity period.
- C. The lot size range must be within the lot size range of the assigned routing.
- D. The consistency check must be performed.
- E. The assigned routing and bill of material (BOM) must have the same validity period.
Answer: B,C,D
NEW QUESTION # 55
What are some options for creating production orders without using trigger points?
Note: There are 2 correct answers to this question.
- A. In assembly production, a sales order triggers the creation of a production order
- B. In make-to-stock production, confirmation of yield for sub-assembly triggers the creation of a production order
- C. In make-to-stock production, you can manually create production orders
- D. In assembly production, confirmation of scrap triggers the creation of a production order
Answer: A,C
NEW QUESTION # 56
Which operations are considered in the capacity scheduling table?
Note: There are 2 correct answers to this question.
- A. Sub-operations
- B. Operations assigned to a pacemaker work center
- C. Only bottleneck operations
- D. All operations
Answer: A,C
NEW QUESTION # 57
Which of the following processes lead to an indicator in the planning file?
Note: There are 2 correct answers to this question.
- A. Changing an operation time
- B. Changing a dependent requirement
- C. Changing a storage bin
- D. Changing a delivery address
Answer: A,B
NEW QUESTION # 58
What are the selection criteria of a bill of material (BOM) alternative?
Note: There are 2 correct answers to this question.
- A. Date
- B. Change number
- C. Material BOM usage
- D. Lot size
Answer: A,D
NEW QUESTION # 59
What is the difference between co-products and by-products?
Note: There are 2 correct answers to this question.
- A. Only co-products have movement type 531.
- B. Only co-products have a non-zero inventory valuation.
- C. Only co-products have movement type 101.
- D. Only co-products appear in the process or production order settlement rule.
Answer: B,C
NEW QUESTION # 60
Which of the following would you recommend as SAP's strategic Sales and Operations planning tool?
- A. Integrated Business Planning
- B. Flexible Planning
- C. Advanced Planning
- D. Standard Sales and Operations Planning
Answer: A
NEW QUESTION # 61
Which of the following are possible configuration steps when setting up the alert monitor in Advanced Planning? Note: There are 2 correct answers to this question.
- A. Assign the overall profile to the authorization profile
- B. Create an object selection variant for alerts according to the priority of ATP categories
- C. Create an object selection variant for production-planning-related alerts
- D. Assign the alert profile to the overall profile
Answer: C,D
NEW QUESTION # 62
Which of the following are features of the clean core dashboard?
Note: There are 2 correct answers to this question.
- A. Customers can use the dashboard in the dev, test, and production tenants.
- B. Customers can grant access to the dashboard to partners.
- C. It can be accessed by using SAP For Me.
- D. It can be used in all SAP S/4HANA Cloud editions.
Answer: B,C
NEW QUESTION # 63
Which options do you have to exclude Advanced Planning materials from the standard MRP run in SAP S/4HANA?
Note: There are 2 correct answers to this question.
- A. Use the material number for selection
- B. Use the special MRP type XO
- C. Use a different MRP planner for PP/DS materials
- D. Use a propagation range
Answer: B,C
NEW QUESTION # 64
You want to set up a make-to-order planning scenario for a finished product. The bill of material contains two components: one should be procured for each sales order individually, and the other should be procured jointly for all independent requirements. Forecasting for the finished product is NOT possible. Which settings do you make to achieve this?
- A. Choose planning strategy 20 (Make-to-Order) and select the corresponding Individual/Collective indicator
- B. Choose planning strategy 50 (Planning without final assembly) and select the corresponding Individual/Collective indicator
- C. Choose planning strategy 20 (Make-to-Order) and select the corresponding Mixed MRP indicator
- D. Choose planning strategy 50 (Planning without final assembly) and select the corresponding Mixed MRP indicator
Answer: A
NEW QUESTION # 65
Which of the following are scheduling time elements for a production order?
Note: There are 3 correct answers to this question.
- A. Float before production
- B. Load time
- C. Setup time
- D. Queue time
- E. Transit time
Answer: A,C,D
NEW QUESTION # 66
What are the possible results of a production planning run in Advanced Planning (PP/DS)?
Note: There are 2 correct answers to this question.
- A. Planned order
- B. Scheduling agreement schedule line
- C. Purchase order
- D. Production order
Answer: A,B
NEW QUESTION # 67
What are prerequisites for a production version to be selected for a production order? Note: There are 3 correct answers to this question.
- A. The production quantity must lie within the lot-size range of the production version.
- B. The production quantity must only lie within the lot-size range of the routing in the production version.
- C. The basic end date of the order must lie within the validity period of the production version.
- D. The production version must NOT be deleted.
- E. The basic start date of the order must lie within the validity period of the production version.
Answer: A,B,E
NEW QUESTION # 68
How can you set up a material as a phantom assembly?
Note: There are 2 correct answers to this question.
- A. Select a special explosion type inside the material BOM (bill of material)
- B. Select a special explosion type inside the material master
- C. Select a special procurement type inside the material BOM (bill of material)
- D. Select a special procurement type inside the material master
Answer: C,D
NEW QUESTION # 69
Your project team decides to use a make-to-order planning strategy for a strategic material in discrete manufacturing. What are the impacts of this decision?
Note: There are 3 correct answers to this question.
- A. Production and procurement costs are managed on the sales order item level.
- B. Sales orders have to be ATP-confirmed (available-to-promise) to be saved.
- C. Storage location MRP areas are required to manage sales-order-specific stock.
- D. Planned orders are created in MRP with reference to sales orders.
- E. Net requirements calculation is carried out for every sales order individually.
Answer: A,D,E
NEW QUESTION # 70
You want to verify that the properties of a component batch align with the required properties of the raw material intended for a specific process order. What function do you use to accomplish this?
- A. Batch number assignment
- B. Batch where-used list
- C. Batch information cockpit
- D. Batch determination
Answer: D
NEW QUESTION # 71
In which master data objects do you maintain data to determine the duration of an operation for production?
Note: There are 2 correct answers to this question.
- A. Work center
- B. Routing
- C. Production version
- D. Material master
Answer: A,B
NEW QUESTION # 72
......
New C-TS422-2504 Exam Questions Real SAP Dumps: https://www.prep4sureguide.com/C-TS422-2504-prep4sure-exam-guide.html
Pass Authentic SAP C-TS422-2504 with Free Practice Tests and Exam Dumps: https://drive.google.com/open?id=1D1AOWpMRt_zwwqw7RpACJEQx7pO45cEs