
[Nov-2021] C_TS422_1909 Dumps are Available for Instant Access using Prep4sureGuide
C_TS422_1909 Dumps 2021 - New SAP C_TS422_1909 Exam Questions
C_TS422_1909 Exam Certification Details:
| Sample Questions: | SAP C_TS422_1909 Exam Sample Question |
| Level: | Associate |
| Exam: | 80 questions |
| Duration: | 180 mins |
| Cut Score: | 55% |
| Languages: | German, English, French, Chinese |
NEW QUESTION 51
Which options do you have to plan both quant ties and capacities during line loading in repetitive manufacturing? Note: There are 2 correct answers to this question.
- A. Assign planned orders manual lying the planning table.
- B. Run MRP with automatic selection of production version.
- C. Run PP/DS heuristics for repetitive manufacturing.
- D. Run MRP with quota arrangement.
Answer: C,D
NEW QUESTION 52
Which actions does the system perform by default when you save a confirmation for a finished product in repetitive manufacturing? Note: There are 3 correct answers to this question.
- A. Material staging for next order in sequence
- B. Posting of goods receipt for the product
- C. Posting of production costs to the production cost collector
- D. Archiving of documents for assembly scrap
- E. Reduction of associated capacity requirements
Answer: B,C,E
NEW QUESTION 53
Which bill of material (BOM) categories can you define in SAP S/4HANA? Note: There are 2 correct answers to this question.
- A. Functional Location BOM
- B. Work Center BOM
- C. Sales Order BOM
- D. Class BOM
Answer: A,C
NEW QUESTION 54
Before a user can add multiple production versions in a material master, what information should be collected?
There are 3 correct answers to this question.
Response:
- A. Work center hierarchy
- B. Lot sizes
- C. BOM status
- D. Validity dates
- E. Task list group number
Answer: B,C,D
NEW QUESTION 55
You are using the document management system (DMS) . Where should the DMS document links be assigned, to have them automatically copied to production orders?
There are 2 correct answers to this question.
Response:
- A. Work center
- B. Bill of material
- C. Material master
- D. Routing header
Answer: B,C
NEW QUESTION 56
In which data objects do you maintain the production line as the work center for repetitive manufacturing?
Note: There are 2 correct answers to this question.
- A. Repetitive manufacturing profile
- B. Routing
- C. Production version
- D. Production cost collector
Answer: B,C
NEW QUESTION 57
An issue storage location was NOT found through the work center, bill of material (BOM)item, or material master. What determines whether the storage location can be derived from the production version?
- A. MRP Profile
- B. MRP Controller
- C. MRP Group
- D. Plant Data
Answer: C
NEW QUESTION 58
In Make-to-order production, which field controls whether the components will be planned as sales order specific stock?
Please choose the correct answer.
Response:
- A. The MRP Type of the component
- B. The item category of the component in the BOM
- C. The Planning Strategy of the finished product
- D. The Individual/Collective indicator of the component
Answer: C
NEW QUESTION 59
Which of the following is used by the MRP Live planning run in SAP S/4HANA?
Please choose the correct answer.
Response:
- A. Parallel processing across servers
- B. MRP list
- C. Planning horizon
- D. Net change planning
Answer: D
NEW QUESTION 60
What are properties of MRP Live?
There are 2 correct answers to this question.
Response:
- A. Data is read sequentially from the database tables
- B. It uses the same BAdis as classic MRP
- C. It is executed on the database server
- D. The code is written in SQL Script
Answer: C,D
NEW QUESTION 61
What must be used in the system to plan the requirements for different subcontractors separately?
Response:
- A. MRP areas
- B. Production versions
- C. Storage locations
- D. Planning plant
Answer: A
NEW QUESTION 62
When the goods receipt for a finished product is posted during confirmation on a manufacturing environment, which of the following actions are also performed by default?
There are 2 correct answers to this question.
Response:
- A. Posting of production costs to cost collector
- B. Reduction of the capacity requirements
- C. Staging of components for the next order in the sequence
- D. Archiving of backflush documents
Answer: A,D
NEW QUESTION 63
Which of the following functions can be performed when the production order has the status "Created" (CRTD)?
Please choose the correct answer.
Response:
- A. A user can schedule a background job to release production orders (transaction COOIS).
- B. A user trigger printing of shop floor paper manually (transaction CO02).
- C. A user can trigger material staging via mass processing (transaction COHV).
- D. A user trigger material availability check via mass processing (transaction COHV)
Answer: B
NEW QUESTION 64
You produce your material based on a forecast derived from historical sales and expect it to be in inventory when your customer orders. If customers order more that the forecasted quantity, you want to increase production to try to meet the extra demand.
Which is the appropriate planning strategy to use?
Response:
- A. 10 - Anonymous make-to-stock
- B. 40 - Planning with-final-assembly
- C. 50 - Planning without final assembly
- D. 20 - Make to order production
Answer: B
NEW QUESTION 65
Which materials have a negative quantity in a bill of materials or in a recipe? Note: There are 3 correct answers to this question.
- A. Co-products
- B. Waste products
- C. Continuous flow materials
- D. Bulk materials
- E. By-products
Answer: A,B,E
NEW QUESTION 66
What determines whether the planned independent requirements in MRP consume other requirements?
- A. Requirements profile
- B. Order type
- C. Consumption sequence procedure
- D. Requirements type
Answer: D
NEW QUESTION 67
Which SAP solutions can be used for forecast ng in Supply Chain Planning? Note: There are 2 correct answers to this question.
- A. Supply Chain Management (SCM)
- B. Integrated Business Planning (IBP)
- C. Material Requirements Planning (MRP)
- D. Capacity Requirements Planning (CRP)
Answer: A,B
NEW QUESTION 68
Why would you use phantom assemblies? Note: There are 3 correct answers to this question.
- A. To make the assignment of components easier
- B. To simplify the structure of bills of material
- C. To reduce the number of material masters
- D. To increase the number of planning levels
- E. To reduce the number of changes required in bills of material
Answer: A,B,E
NEW QUESTION 69
What is the purpose of a reporting point confirmation in repetitive manufacturing? Note: There are 2 correct answers to this question.
- A. To determine the work in progress along the production line
- B. To reduce the total production lead time for along production line
- C. To stage different components for a production line simultaneously
- D. To provide timely updates of inventory management for the staged components
Answer: A,D
NEW QUESTION 70
In which of the following master data objects can you define the production order default storage location for a material component?
There are 2 correct answers to this question.
Response:
- A. Work center, in the production supply area
- B. Material master of the finished product
- C. Routing, in the component allocation
- D. BOM, in the item for the material
Answer: A,D
NEW QUESTION 71
What new technology is used in SAP S/4HANA Embedded Analytics?
Please choose the correct answer.
Response:
- A. Multidimensional Reporting client (MDRC)
- B. ABAP Managed Core Data Services (CDS)
- C. Smart Business Cockpit
- D. HANA Live
Answer: B
NEW QUESTION 72
......
SAP C_TS422_1909 Exam Practice Test Questions: https://www.prep4sureguide.com/C_TS422_1909-prep4sure-exam-guide.html