Get Ready to Pass the CTAL-TAE exam with ISQI Latest Practice Exam [Q14-Q35]

Share

Get Ready to Pass the CTAL-TAE exam with ISQI Latest Practice Exam

Get Prepared for Your CTAL-TAE Exam With Actual ISQI Study Guide!


The CTAL-TAE certification exam is a rigorous exam that tests the knowledge and skills of test automation engineers. It requires individuals to demonstrate their ability to design, implement, and execute automated tests in a variety of contexts. The exam is administered by ISQI, a leading provider of software quality certifications, and is recognized globally as a standard for advanced level test automation engineering.


The certification exam consists of 40 multiple-choice questions and lasts for 90 minutes. The exam is conducted in a proctored environment and can be taken at any of the authorized testing centers around the world. The passing score for the CTAL-TAE exam is 65%, and the certification is valid for five years.

 

NEW QUESTION # 14
Consider a TAS that exclusively uses the APIs of a SUT. To make this work, significant changes have been required to the SUT by adding a set of dedicated test interfaces to the APIs. All the automated tests will use these test interfaces when interacting with the SUT. Assume that you are currently verifying the correctness of the automated test environment and test tool setup.
Which of the following would you expect to be the MOST specific risk associated with this scenario?

  • A. The connectivity from the TAS to the dedicated test interfaces will not work
  • B. The automated test cases will not contain the expected result
  • C. False alarms, that are unlikely to occur in the real world, will be observed during testing
  • D. The process of configuring the TAS will be error-phone due to manual intervention

Answer: A


NEW QUESTION # 15
Which of the following success factors for a test automation project is TRUE?

  • A. The test cases to be automated first must always be selected based on the number of times a test will need to be run
  • B. The test cases to be automated must have a high dependency on particular data values
  • C. Automated tests that fail due to changes in the requirements of the SUT should be promptly fixed rather than disabled from the test suite
  • D. Automated tests must be designed to capture only the data that is strictly needed for comparing expected and actual results

Answer: C


NEW QUESTION # 16
A web application was released into production one year ago, it has regular release which follow a V-model lifecycle and testing is well-established and fully integration into the development lifecycle. You have beenasked to implement a TAS for the regression test suite. The regression tests have been developed via the GUI and are expected to be run at least four times a month, for each planned release, for the whole operation solution life of the system (six years). Each screen of the GUI uses several third-party controls which are not compatible with the existing automation solutions. The environment for the automation will be stable, fully controllable and separated from other environments (development, staging, production).
What could be the MOST problematic for this TAS?

  • A. Frequency ofuse
  • B. Complexity to automate
  • C. Maturity of the test process
  • D. Sustainability of the automated environment

Answer: D


NEW QUESTION # 17
Consider a TAS that uses a keyword-driven framework. The SUT is a web application and there is a large set of keywords available for writing the automated tests that relate to highly specific user actions linked directly to the GUI of the SUT. The automated test written with the keywords are statically analyzed by a custom tool which highlight's repeated instances of identical sequence of keywords. The waiting mechanism implemented by the TAS for a webpage load is based on a synchronous sampling within a given timeout. The TAS allows checking a webpage load every seconds until a timeout value

  • A. Changing thescripting approach to data-driven scripting
  • B. Implementing keywords with a higher level of granularity
  • C. Changing the wait mechanism to explicit hard-coded waits
  • D. Establishing an error recovery process for TAS and SUT

Answer: C


NEW QUESTION # 18
Consider the following example of TAS metrics.
Time to execute automated tests
Speed and efficiency of TAS components
Which of the following statements is TRUE?

  • A. A and B are both internal TAS metrics
  • B. A is and external TAS metric and b is an internal TAS metric
  • C. A and b are both external TAS metric
  • D. A is an internal TAS metric and B is an external TAS metric

Answer: A


NEW QUESTION # 19
Which of the following statement about the implementation of automated regression testing is FALSE?

  • A. When automating regression tests, consideration should be given to how much time would be saved by automation
  • B. When automating regression tests, the structure of automated tests mustalways be the same as the corresponding manual tests
  • C. When automating regression tests, theinitialization steps set the test preconditions should be automated wherever possible
  • D. When automating regression tests, the corresponding manual tests should have already been executed to verify they operate correctly

Answer: A


NEW QUESTION # 20
As a TAE you are evaluating a functional test automation tool that will be for several projects within your organization. The projects require that tool to work effectively and efficiently with SUT's in distributed environments. The test automated tool also needs to interface with other existing test tools (test management tool and defect tracking tool.) The existing test tools subject to planned updates and their interface to the test automated tool may not work property after these updates.
Which of the following are the two LEAST important concerns related to the evaluation of the test automation in this scenario?
* Is the test automation tool able to launch processors and execute test cases on multiple machines in different environments?
* Does the test automation tool support a licensing scheme thatallows accessing different sets?
* Does the test automation tool have a large featureset, but only part of the features will be sets?
* Do the release notes for the planned updates on existing specify the impacts on their interfaces to other tools?
Does the test automation tool need to install specific libraries that could impact the SUT?

  • A. A and C
  • B. C and D
  • C. B and E
  • D. A and E

Answer: C


NEW QUESTION # 21
Which of the following statements BEST describe aspects of the SUT to consider when designing a TAA?

  • A. All the external test interfaces of the SUT should be removed prior to the product release
  • B. All the interaction between SUT and TAS should be logged with the highest level of detail
  • C. All the internal test interfaces of the SUT should be removed prior to the product release
  • D. All the interface of the SUT affected by the tests should be controllable by the TAA

Answer: B


NEW QUESTION # 22
Consider a TAS associated to dynamically changing software frequent releases. Your goal is todetermine the amount of effort required to maintain the automated tests of the regression test suite for each new release of the SUT.
What is the MOST important metric to collect to achieve your goal?

  • A. The time it takes to execute all the automated tests, for each new release of the SUT.
  • B. The code coverage achieved with the automated tests,for each new release of the SUT
  • C. The number ofautomated tests requiring maintenance, for each new release of the SUT.
  • D. The number of automated tests which fail because of a single software defect, for each new release of the SUT

Answer: D


NEW QUESTION # 23
Which of the following is NOT a technical design consideration for a TAA?

  • A. Standards and Legal requirements, e.g data privacy
  • B. The number of users for the SUT
  • C. Availability of interfaces for the SUT to be testable
  • D. Data used by the SUT, e.g configuration, users

Answer: B


NEW QUESTION # 24
Which of the following attributes should NOT be included in a test execution report associated with a suite of automated tests?

  • A. System/Application under test and its version
  • B. Environment in which the tests have been executed
  • C. Defect clusters identified during test execution
  • D. Summary of the test execution results

Answer: C


NEW QUESTION # 25
A defect in a SUT has been resolved and validated by an automated defect re-test in the current release of the software. This retest has now been added to the automated regression test suite.
Which statement BEST describes a reason why this defect could re-occur in future releases?

  • A. Theconfiguration management process does not properly control the synchronization between software archives
  • B. The automated regression test suite has a narrower scope of functionality
  • C. Automated defect confirmation testing is not effective at confirming that the resolved defect will continue to work in future releases
  • D. The automated regression test suite is not run consistently for future releases.

Answer: A


NEW QUESTION # 26
A regression test suite consist of 500 test cases which are all executed manually. The business case for a pilot project is based on the adoption of test automation using a commercial tool that will reduce the execution time by a factor of 90% for 100% of the tests in the regression test suite. The pilot project lasted one month ( as planned) and you are currently its results. At the end of the pilot project, 40% of the regression tests have been automated and their execution time has been reduce by 60%.
Which of the following statements is TRUE in this scenario?

  • A. The duration of the pilot project was too short -it should last unit the success factors are achieved
  • B. The project selected for the pilot is too critical -if should not be too critical or too trivial
  • C. Thetarget defined for the business case seems difficult to hit - it should be realistic
  • D. The target defined for the business case is too accurate -it should not be measureable

Answer: C


NEW QUESTION # 27
You have been asked to determine a TAS for a new release of a SUT,test should be automated wherever. The new release will consist of 5 new interfaces and an amendment to 3 existing interfaces. The new and amended interface will be deliver incrementally in 3 sprints, each lasting 2 weeks.
What would be the BEST Test Automation Solution (TAS) design in this scenario?

  • A. Automate a test at once level, component level, Create customized interface/test hooks for this level where the interface has not yet been developed or amended.
  • B. Automate the tests at two levels, Component and System level. Create customized hooks at Component level for interface not yet developed or amended. Only use the newly developed or amended interfaces to test at System level.
  • C. Automate tests at one level only, System level. Use only the newly developed interfaces and do not create any customized interfaces/test hooks.
  • D. Automate tests at both Component and System Level. Only do this automation once every interface has been fully developed or amended and manual testing has completed successfully.

Answer: D


NEW QUESTION # 28
Consider a TAS associated to dynamically changing software frequent releases. Your goal is to determine the amount of effort required to maintain the automated tests of the regression test suite for each new release of the SUT.
What is the MOST important metric to collect to achieve your goal?

  • A. The time it takes to execute all the automated tests, for each new release of the SUT.
  • B. The number of automated tests requiring maintenance, for each new release of the SUT.
  • C. The number of automated tests which fail because of a single software defect, for each new release of the SUT
  • D. The code coverage achieved with the automated tests, for each new release of the SUT

Answer: C


NEW QUESTION # 29
You are using a gTAA to create a TAS for a project. The TAS is aimed specifically at automating a suit of existing manual test cases for standalone desktop applications. All the interfaces between the TAS and SUT will be from the CUI of the application.
Which of the following layers of the gTAA should you focus on for the TAS?

  • A. The Test Definition layer
  • B. The test Generation layer
  • C. The Test Execution layer
  • D. The Test Adaption layer

Answer: B


NEW QUESTION # 30
Consider A TAS for testing a desktop application via its GUI. All the test cases of the automated test suite contain the same identical sequences of steps at the beginning (to create the necessary objects when doing a preliminary configuration of the test environment and at the end (to remove everything created -specifically for the test itself during the preliminary configuration of the test environment). All automated test cases use the same set of assertion functions from a shared library, for verifying the values in the GUI fields (e.g text boxes).
What is the BEST recommendation for improving the TAS?

  • A. Implementing keywords with higher level of granularity
  • B. Adopting a set of standard verification methods for use by all automated tests
  • C. Implementing standard setup and teardown functions at test case level
  • D. Improving the architecture of the application in order to improve its testability

Answer: A


NEW QUESTION # 31
You are working on a TAS for standalone application. The automated tests are developed based on a automation framework that allows interaction with GUI elements using on object orientated API. The GUI elements include menus, buttons, radio buttons, text toolbars and their properties.
Whilst automating a test, you have discovered that the GUI elements of some third party components are not identifiable by the automated tool you are using.
Which of the following is the FIRST stepthat you take to investigate this issue?

  • A. Verify the testability support with the providers of the third party components
  • B. Adopt an approach that uses the coordinates of the GUI elementsinstead
  • C. Verify whether naming standards for variables and have been defined for the current automation solution
  • D. Verify whether the GUI identification depends on the browser.

Answer: A


NEW QUESTION # 32
Consider a TAS deployed into production. The SUT is a web application and the test suite consists of a set of automated regression tests developed via GUI. A keyword-driven framework has been adopted for automating the regression tests. The tests are based on identification at low-levels of the web page components (e.g class indexes, tab sequence indexes and coordinates) in the next planned release the SUT will be subject to significant corrective maintenance (bug-fixes) and evolution (new features) Maintenance costs to update the test scripts should be as low as possible and the scripts must be highly reusable.
Which of the following statements is most likely to be TRUE?

  • A. The total execution time of the automated regression test suite will decrease for each planned release.
  • B. False positive errors are likely to occur when running the automated tests on the new releases without modifying the test
  • C. The keyword-driven framework introduces a level abstraction that is too high and makes it difficult what really happens
  • D. The keyword-driven framework is not suitable, it would be better to adopt a structured-scripting approach

Answer: D


NEW QUESTION # 33
Which of the following statements about the reuse of TAS artefacts is TRUE?

  • A. Communications maintenance and improvements for reusing TAS artefacts are modify addressed during the design of the TAA
  • B. To enable reuse of TAS artefacts, a good design for reuse is built into the TAA and to further action are needed during the TAS lifecycle
  • C. Reusable TAS artefacts can include components (or parts of components) associated with different layers of the TAA
  • D. Reusable TAS artifacts associated with the definition layer of the TAA include the adaptors to the SUT components and/or interfaces

Answer: C


NEW QUESTION # 34
You identified a suitable project to pilot an automation tool and planned and conduced a pilot. The pilot has been successful and tool Is being deployed within your organization, with a plan to increase tool use by the one project at a time. During this rollout some test processes will be changed slightly to gain additional benefits from using the tool.
In the pilot project, a small set of manual tests were automated for the first time. You are currently monitoring the test automation efficiency and this reveals that the automation regime for the tests is not yet mature.
Which of the following statements is TRUE?

  • A. The pilot project should have been critical so that maximum benefits were delivered
  • B. The approach used for deployed this tool is aligned to the standard success factor for deployment
  • C. The test process should be radically changed to gain additional benefits from using the tool.
  • D. The target defined for the project was inappropriate, because the automation regime for the automated tests at the end of the pilot is not yet mature.

Answer: B


NEW QUESTION # 35
......

Pass Your Next CTAL-TAE Certification Exam Easily & Hassle Free: https://www.prep4sureguide.com/CTAL-TAE-prep4sure-exam-guide.html

Free ISQI CTAL-TAE Exam Question Practice Exams: https://drive.google.com/open?id=1QKv-QiOmbk4RFaqqpZ5K4pZ9UZS_azsC